what is stuttering and right time of de-shuttering?

SHUTTERING= Shuttering is a part of construction, or you may call it as derivative of formwork. Shuttering is a vertical temporary arrangement which is arranged to bring concrete in a desired shape.

or
Formwork which supports vertical arrangement is known as shuttering he gives proper shape concrete.
In a technical point of view, Formwork for column, footings, retaining walls is called as a Shuttering   De-Shuttering time of shuttering (IS 456:2000)
  1. Vertical shutting of Wall, Beam and Column 16-24 Hours.
  2. Internal shutting of Roof slab 3 Days.
  3. Internal shuttering of Beam 7 Days.
  4. Vertical support of Slab. Span less than 4.5 m 7 Days. Span more than 4.5 m 14 Days.
  5. Vertical supports of Beam and Arch. Span less than 6 m 14 Days.